2027 Air and Noise Ontario EASR Transition

MECP Transition Requirements – Air and Noise

The mandatory Environmental Activity and Sector Registry (EASR) approval deadline is January 31, 2027.

If you currently operate under an air and noise ECA and are applicable for an EASR registration under Ontario Regulation 1/17, you must transition before the rapidly approaching deadline.

An EASR can reduce administrative time and accelerates approvals under Ontario Regulation 1/17 and related legislation. If your facility is not eligible, your ECA will remain and should be maintained within the existing regulations.

Your industry alone may not determine whether the EASR applies. Many lower-risk air and noise activities are subject to EASR registration, while certain higher-risk activities and sectors are excluded from the EASR, and follow that with a call to action to contact us to make a clear determination.

Please use the Eligibility Questionnaire in the following tab to help assess your transition requirements.

Stay ahead of the EASR transition with BlueFrog. Our team is here to help you navigate permitting and reporting requirements with confidence.

Contact us today to find out how we can support your compliance journey.

compliance@bluefrogconsulting.ca or 647-991-8161

James Power
B.A.(H), EP, EP(CEA)

Senior Project Director
(647) 991-8161
jrpower@bluefrogconsulting.ca

Mary Mekhail
P.Eng., M.Eng.

Air Engineer
 226-821-9154
mmekhail@bluefrogconsulting.ca

EASR ELIGIBILITY QUESTIONNAIRE

Please complete the following questions to determine if you are required to update to EASR by January 31, 2027.

Name
Phone
* If unknown, please refer to the following link to best approximate which code suits your business or reach out to BlueFrog for assistance: North American Industry Classification System Canada 2022
Do any of the activities below take place at the facility?(Required)
Does your facility carry out any of the following activities?(Required)
Yes/No
Yes/No

O. Reg. 1/17: Schedule

NAICS codes, paragraph 1 of s. 2 (2) of the Regulation

For the purposes of this Schedule, a facility is part of a class identified by a NAICS code if the facility is identified by a NAICS code that begins with a NAICS code listed below.

The following are the NAICS codes mentioned in paragraph 1 of subsection 2 (2) of the Regulation:

  • 2122 — Metal ore mining
  • 2123 — Non-metallic mineral mining and quarrying
  • 22132 — Sewage treatment facilities
  • 31122 — Starch and vegetable fat and oil manufacturing
  • 31161 — Animal slaughtering and processing
  • 321111 — Sawmills (except shingle and shake mills)
  • 3221 — Pulp, paper and paperboard mills
  • 32411 — Petroleum refineries
  • 32412 — Asphalt paving, roofing and saturated materials manufacturing
  • 32419 — Other petroleum and coal product manufacturing
  • 325 — Chemical manufacturing
  • 32615 — Urethane and other foam product (except polystyrene) manufacturing
  • 3262 — Rubber product manufacturing
  • 32731 — Cement manufacturing
  • 32732 — Ready-mix concrete manufacturing
  • 32741 — Lime manufacturing
  • 3279 — Other non-metallic mineral product manufacturing
  • 331 — Primary metal manufacturing
  • 3321 — Forging and stamping
  • 33281 — Coating, engraving, cold and heat treating and allied activities
  • 332999 — All other miscellaneous fabricated metal product manufacturing
  • 336 — Transportation equipment manufacturing
  • 56211 — Waste collection
  • 5622 — Waste treatment and disposal
  • 5629 — Remediation and other waste management services
  • 81222 — Cemeteries and crematoria

Subsection 1: EASR if emitting to atm.
Subsection 2: ECA if NAICS code (left) or specifics in tab 2.

ECA vs EASR

Scroll right to view table->

ECA

Environmental Compliance Approval
vs.

EASR

Environmental Activity and Sector Registry
Formal application submitted to MECP; may take months or a year for approvalApproval ProcessOnline registration with Licenced Engineering Practitioner (LEL)-prepared documents; approval is immediate
MECP conducts detailed overviewRegulatory OversightMECP reviews only when needed
Annual reporting to MECPReporting RequirementsUpdate every 10 years or when changes occur
No expiry; some expire in 5 to 10 yearsApproval DurationNo expiry; update every 10 years or when changes occur
Fees depend on emission sourcesFeesNo fees, as of June 2025
Less flexible; amendments often requiredFlexibilityMore flexible within regulation limits
ESDM Report requiredContaminant Emissions AssessmentESDM Report required
Primary and Secondary Noise Screening Reports and Acoustic Assessment Report requiredNoise AssessmentGenerally, the same requirements as an ECA
For more complex operations with higher environmental and health impactsOperational ComplexityFor simpler operations with lower environmental and health impacts
Mining, metal, or chemical manufacturing, refineries, waste facilities, etc.Typical ActivitiesFood/beverage production, labs, schools, printing, small manufacturers, etc.